aro
06-29-05, 03:00 PM
I’m adding additional shower to existing one on the opposite wall. The current shower is getting feeded form 4 pipes connected in to one. I’ll try to give you a picture:
<img src="http://images.snapfish.com/34432%3A%3A%3B23232%7Ffp54%3Dot%3E234%3A%3D%3B87%3D497%3DXROQDF%3E2323936%3B9%3C6%3A3ot1lsi" name="Test" border="0">
I’m not sure if I should feed the second shower from the pipes that are feeding the current shower or should I connect the second shower pipe to the 1” pipe that is on the top of the four ½“ pipes.
<img src="http://images.snapfish.com/34432%3A%3A%3B23232%7Ffp54%3Dot%3E234%3A%3D%3B87%3D497%3DXROQDF%3E2323936%3B9%3C6%3A3ot1lsi" name="Test" border="0">
I’m not sure if I should feed the second shower from the pipes that are feeding the current shower or should I connect the second shower pipe to the 1” pipe that is on the top of the four ½“ pipes.