I am getting ready to reroof a house I purchased. I will be tearing the old roof off down to the decking. Could someone tell me if I have the correct sequence for this job.
1.) Install drip edge around perimeter of roof.
2.) install new flashing around chimney. New covers around all plumbing vents.
3.) Install ice shield 36" from edge of roof. Front & back.
4.) Install felt paper entire roof. Can I leave the felt paper on over night or for a couple of days to protect house or should I use a tarp & put the felt paper down as I go. I am told that if I leave the felt paper on over night or for a couple of days it will bubble & x's with a razor knife will be the only way to get rid of the bubble.
5.) Install shingles.
I know that the install will take time & I want to protect the house while I am doing this project. Would like your opinions.
1.) Install drip edge around perimeter of roof.
2.) install new flashing around chimney. New covers around all plumbing vents.
3.) Install ice shield 36" from edge of roof. Front & back.
4.) Install felt paper entire roof. Can I leave the felt paper on over night or for a couple of days to protect house or should I use a tarp & put the felt paper down as I go. I am told that if I leave the felt paper on over night or for a couple of days it will bubble & x's with a razor knife will be the only way to get rid of the bubble.
5.) Install shingles.
I know that the install will take time & I want to protect the house while I am doing this project. Would like your opinions.