BoatCop
04-03-05, 05:29 AM
Good Morning. :coffee:
I'm getting ready to lay rolled asphalt roofing on a low slope (1/12) patio cover. 1/2 " plywood sheathing. 15# felt. Desert climate. High heat. No snow. Seasonal wind and rain/monsoon.
I've got a pretty good handle on the requirements, but have one question.
The patio cover is 14' X 40'. Should I lay the roofing down in one continuous 40' span, or should it be broken up into overlapped smaller runs? 10'? 15'? 20'?
Thanks in advance.
I'm getting ready to lay rolled asphalt roofing on a low slope (1/12) patio cover. 1/2 " plywood sheathing. 15# felt. Desert climate. High heat. No snow. Seasonal wind and rain/monsoon.
I've got a pretty good handle on the requirements, but have one question.
The patio cover is 14' X 40'. Should I lay the roofing down in one continuous 40' span, or should it be broken up into overlapped smaller runs? 10'? 15'? 20'?
Thanks in advance.