steve10112
03-24-05, 01:56 PM
I need to run oval sheetmetal a/c ductwork (approx 3x10) from the second to first floor between the 2x4 wall studs on an exterior wall. Two problems arise:
the first, electrical wiring is running horizontally (center drilled)thru the same bays, is there an issue with pushing the wires back against the plywood or in towards the sheetrock providing there is enough slack, the second, how do the inspectors feel about cutting that much away from the wall plates to accomadate the ductwork. Thanks for all the info!
the first, electrical wiring is running horizontally (center drilled)thru the same bays, is there an issue with pushing the wires back against the plywood or in towards the sheetrock providing there is enough slack, the second, how do the inspectors feel about cutting that much away from the wall plates to accomadate the ductwork. Thanks for all the info!