quadcells
11-23-04, 01:01 PM
Hello All,
Just about ready to connect the pipes from the 2nd floor addition to the main heating system in the basement.
So I would like to pressurize the lines to check for leaks before connecting to hot water system.
Is this a good Idea or not?
Is 75 psi ok ?
Thanks in advance
-
Just about ready to connect the pipes from the 2nd floor addition to the main heating system in the basement.
So I would like to pressurize the lines to check for leaks before connecting to hot water system.
Is this a good Idea or not?
Is 75 psi ok ?
Thanks in advance
-