View Single Post
  #5 (permalink)  
Old 01-12-09, 12:37 PM
slickracer slickracer is offline
Member
 
Join Date: Apr 2005
Location: Pennsylvania
Posts: 105
Just an update, we are having the contractor re-frame the opening with 2x6's since several of the 4x4s are not plumb and 2 need replaced since they are twisted. Should make for a better job.
Reply With Quote