| JazMan, fill me in. Gridding the floor will indicate lines at certain places. Just where would you start the floor? I always start on my grids working my way to the edges where cuts are made if necessary. When we do framing layouts on concrete floors to build walls, we snap red lines then spray over them with polyurethane. The lines stay put and we can sweep the floor without losing our lines. |